Project Description: Birkbeck Structures was brought in to provide the full turnkey solution for the extension of an existing distribution warehouse. Our team supplied the design, supply and install of an additional portal frame span to increase the capacity of the existing warehouse at P&B Foods.
This project posed a unique challenge for our team – integrating the new build into the existing structure while maintaining full operation of the existing warehouse.
The new portal frame span was 29m and the total length of new build was 180m with a maximum height of 14.5m. Within the new build, there as an additional 2 storey plant and production structure which was integrated into the portal frame.
Birkbeck Structures successfully completed this project with minimal disruption to warehouse operations, ensuring customer satisfaction and a high-quality portal frame.
Our Projects
Other Case Studies
Click below to view more of our case studies:
Highcross Street, Leicester
Alliot House, Student Accommodation
P&B Foods, Processing and Distribution Warehouse
Gladstone Parade, Build to Rent
Broughton Crossroads, Extra Care
Get in touch today
For more details on our hybrid steel frame or capacity for your project, talk to a member of Birkbeck Structures today.
Engaging with Birkbeck Structures early in the design process allowed us to take advantage of their innovative hybrid frame solution, giving certainty in delivery of the structure and ease of coordination of following trades with rapid project completion in comparison to a traditional building solutions”.
Peter Warring
Managing Director, John Warring & Sons