Commerical Case Study

Gladstone Parade,
Build to Rent

Location: Edgware Road, Cricklewood

Client: UPG

Project Value: £1.8M

On Site Programme: 18 Weeks

Project Description: This new apartment building integrates 6 storeys of apartments with commercial units and carparking at ground floor level.

Birkbeck Structures was involved with the production of the steel framework for this building, implementing a hybrid solution that catered to the requirements of the different levels.

The ground floor was constructed from a traditional steel frame allowing an open plan layout to suit the retail units and carpark as well as acting as a transfer deck to the upper structure; this included long span trusses to allow carpark access.

Levels 1 to 6 were constructed utilising our flexible integrated steel frame concept, formed from a combination of light gauge steel frame and traditional hot rolled steel, steel deck and concrete floors with integrated balconies. This form of construction introduces many of partition and external walls during structural frame installation, allowing for following trades to commence immediately after the erection of each phase/floor.

In addition, a masonry facia was supported from level 1, which allowed the finished building to be aesthetically consistent with other buildings in the locale.

Commercial Case Study

Installation
Operation

B111 Installation Process 5

Commerical Case Study

Architectural
CGI

Commercial Case Study

3D Structural Model

Front:

Rear:

Our Projects

Other Case Studies

Click below to view more of our case studies:

Highcross Street, Leicester

For this project, we deployed our hybrid steel frame system, a combination of traditional hot-rolled steel and light gauge steel framing.
Read More

Alliot House, Student Accommodation

A steel framework was required for the construction of student accommodation on this project. The building consisted of commercial units and amenities at ground floor, including a mezzanine level, and 15 storeys of student dwellings above
Read More

P&B Foods, Processing and Distribution Warehouse

Birkbeck Structures was brought in to provide the full turnkey solution for the extension of an existing distribution warehouse. Our team supplied the design, supply and install of an additional portal frame span to increase the capacity of the existing warehouse at P&B Foods.
Read More

Gladstone Parade, Build to Rent

This new apartment building integrates 6 storeys of apartments with commercial units and carparking at ground floor level. Birkbeck Structures was involved with the production of the steel framework for this building, implementing a hybrid solution that catered to the requirements of the different levels.
Read More

Broughton Crossroads, Extra Care

This residential project comprised of two apartment blocks, for which steel was chosen as the structural framing system. Birkbeck Structures was enlisted to provide steel frameworks for the two buildings.
Read More

Get in touch today

For more details on our hybrid steel frame or capacity for your project, talk to a member of Birkbeck Structures today.



    Engaging with Birkbeck Structures early in the design process allowed us to take advantage of their innovative hybrid frame solution, giving certainty in delivery of the structure and ease of coordination of following trades with rapid project completion in comparison to a traditional building solutions”.

    Peter Warring
    Managing Director
    , John Warring & Sons