Residential Case Study
Alliot House, Student Accommodation
Location: Forest Road, Walthamstow
Client: Watkin Jones Construction
Project Value: £4.4M
On Site Programme: 42 Weeks*
*Excluding Covid19 shutdown
Project Description:A steel framework was required for the construction of student accommodation on this project. The building consisted of commercial units and amenities at ground floor, including a mezzanine level, and 15 storeys of student dwellings above.
This project demonstrates the first iteration of Birkbeck Structures’ flexible integrated steel frame concept, utilised to enhance stability and strength in higher constructions.
We constructed the ground and mezzanine floors from a traditional steel frame, allowing an open plan layout to suit the retail units and amenities as well as acting as a transfer deck to the upper structure.
Levels 1 to 15 were constructed utilising our flexible integrated steel frame concept, formed from a combination of light gauge steel frame and hot rolled steel, steel deck and concrete floors.
This form of construction incorporates many of the partition and external walls during structural frame installation, allowing for following trades to commence immediately after the erection of each phase/ floor.
Our approach to this student accommodation project ensured the streamlined and efficient construction of the high-rise building.
Residential Case Study
CGI West Elevation

Residential Case Study
CGI East Elevation

Our Projects
Other Case Studies
Click below to view more of our case studies:
Highcross Street, Leicester
Alliot House, Student Accommodation
P&B Foods, Processing and Distribution Warehouse
Gladstone Parade, Build to Rent
Broughton Crossroads, Extra Care
Get in touch today
For more details on our hybrid steel frame or capacity for your project, talk to a member of Birkbeck Structures today.
Engaging with Birkbeck Structures early in the design process allowed us to take advantage of their innovative hybrid frame solution, giving certainty in delivery of the structure and ease of coordination of following trades with rapid project completion in comparison to a traditional building solutions”.
Peter Warring
Managing Director, John Warring & Sons